City, well, and delivered water; reading a feed water report; the system drawing and its valves; sizing; and validation.
PublishedNailathalaGipatikPepalwal:ReferencesMga SanggunianMga TinubdanReng Reperensya:1Audience: Dialysis water treatment technicians and trainees · chief technicians, head nurses, and medical directors who supervise the water systemRead timeOras ng pagbasaOras sa pagbasaOras ning pamamasa:
Study series for dialysis water treatment technicians
This module is study material for dialysis water treatment technicians. It explains the reasons behind safe practice; it does not replace your unit’s approved procedures, the manufacturer’s instructions for your equipment, or the limits your facility has adopted. Limits quoted here come from the international standard and are given so the numbers make sense; your facility’s written limits and action levels are the ones you work to. Every case is fictional.
Learning objectives
After this module you should be able to
Describe how city, deep-well, and delivered water differ, and what each one demands of the system.
Read a feed water analysis and say what each line means for treatment.
Follow a system drawing, find the valves and bypasses, and state the normal position of each.
Explain how a system is sized, and why it is validated before first use and after any major change.
Pre-testBefore you read, answer the 5 self-assessment questions and note your score. After the module, select New set of questions and compare. The difference is what you learned; the questions you still miss are what to reread.
Start here
The big picture, in plain words
In plain wordsThink of a rice cooker bought for a family of four. It cooks well every day, as long as the family stays four. Invite the whole barangay to a fiesta, or switch to a different kind of rice, and the same cooker turns out half-raw or burnt. A water system is like that cooker. It is designed for one particular water supply and one particular workload.
The picture has a limit. When rice comes out wrong, everyone at the table can see it. When a water system falls behind its new source or its new workload, the water still looks clear and the displays may still read normal. Change either one, a new well, a tanker delivery, four more stations, and the system that was safe last month may no longer be. Your work is to know what the system was designed for, so that you can tell when reality has moved away from the design.
Figure 1 · Key terms for this module
Feed water analysisA laboratory report on the water entering the system.
Total dissolved solidsThe total amount of minerals and salts dissolved in the water.
TurbidityCloudiness caused by fine particles.
Bypass valveA valve that lets water go around a treatment stage.
Normally closedA valve that stays shut in routine operation.
Peak demandThe most water the unit needs at any one moment.
ValidationDocumented proof, before patients use it, that the system produces water within limits.
Opening case · fictional
Case: A new well replaces the city supply
To cut costs and avoid supply interruptions, the building owner has the clinic switched from city water to a newly drilled deep well. Nobody tells the water room.
Over the next three weeks, the technician, Mr. Noel Santiago, 29, notices three things. The softener now needs regenerating twice as often as before. The sediment filter loads up quickly, and its housing is lined with reddish deposits. And on a Wednesday at 6:15 in the morning, the chlorine test reads zero at the feed tap, just as it does after the carbon tanks.
Before reading on, decide:
What do the reddish deposits and the faster softener exhaustion tell you?
The feed chlorine is zero. Is that good news?
What should have happened before the source was changed?
Keep your answers in mind. The lesson gives you what you need, and the case review near the end shows one sound response.
Lesson · part 1
Three sources, three sets of problems
Figure 2. Source water decides the design. City water, deep-well water, and delivered water bring different contaminants.
Each kind of source brings its own problems. The source tells you which stage will work hardest and what to watch for.
Figure 3. Three sources, three problems. Three water sources and the main problem each brings.
Source
Typical character
Main demands on the system
What to watch
City (municipal) water
Disinfected with chlorine or chloramine; quality fairly steady, but it changes after pipe work, floods, or a change of disinfectant
Enough carbon capacity for the highest disinfectant dose expected
Utility notices; total chlorine in the feed; sediment after main breaks
Deep well
Usually no disinfectant; often hard; may carry iron, manganese, and more dissolved minerals; bacteria possible
A larger softener; iron removal if needed; attention to microbial growth, because nothing in the feed holds it back
Hardness, iron staining, how often the softener regenerates, seasonal change
Delivered (tanker) water
Unknown, and variable from one load to the next
Testing each delivery as a new source
Chlorine, hardness, turbidity, the tanker’s previous cargo
Many Philippine units use more than one source over a year: city water with a deep well as backup, or tankers during shortages. Each switch is a change of source. Report it to the charge nurse and the medical director, and follow the unit’s procedure for a source change before any patient is dialyzed on the new water.1
Lesson · part 2
Reading a feed water analysis
A feed water analysis is done when the system is designed, again at intervals, and whenever the source changes. You do not need to be a chemist to use it. Read each line as a message about one part of the system.
Line on the report
What it means
Which part of the system it affects
Total chlorine, and whether chloramine is used
How much disinfectant the carbon must remove
Carbon tank size and how often the carbon is replaced
Hardness (calcium and magnesium)
How fast the softener resin is used up
Softener size and how often it regenerates
Iron and manganese
Metals that foul softener resin and membranes and stain equipment reddish or black
May need a dedicated iron filter ahead of the softener
Total dissolved solids, or conductivity
The overall mineral load
How hard the reverse osmosis unit works, and the product conductivity you can expect
Turbidity or silt density index
Fine particles that plug filters and membranes
Sediment filtration and cartridge life
pH
How acidic or alkaline the water is
Carbon removes chloramine less efficiently at high pH; membrane performance also shifts
Temperature range
Cold water lowers membrane output
System capacity on the coldest day
Aluminum, fluoride, nitrate, sulfate, and metals
Toxic contaminants that must be brought below dialysis limits
Reverse osmosis performance; how much margin the membrane has
Bacteria
The microbial load entering the system
How the system is disinfected
RememberKeep the design-stage feed water report in the water room file. When something changes, compare the new report with the old one, line by line.
Lesson · part 3
The system drawing and its valves
Every system should have a current drawing that shows each component in order, with every valve, gauge, and sample port numbered to match a tag on the equipment. The drawing is your map. If your system has no drawing or no tags, making them with your preceptor is the best first project you can take on.
Figure 4. Reading the system drawing. Simplified piping drawing of a dialysis water system with a symbol legend.
Figure 5 · Valves you must be able to find
Isolation valvesOne before and one after each tank or filter, so that it can be serviced.
Bypass valvesLet water go around a stage. Useful during service; dangerous if left open.
Sample portsSmall taps at defined points. Keep them clean and capped.
Drain valvesUsed for backwash, rinse, and emptying tanks.
Check valvesLet water flow one way only, and protect against backflow.
Pressure relief valveOpens if the pressure climbs too high.
Valve
Normal position during treatment
What happens if it is wrong
Carbon tank bypass
Closed, and locked or tagged
Chlorine and chloramine go straight to the reverse osmosis unit and on to the patients
Softener bypass
Closed
Hard water scales the membrane
Reverse osmosis bypass, if fitted
Closed, and locked or tagged
Untreated or partly treated water enters the loop
Loop return valve
Open
Water stops circulating; pressure and bacterial risk rise
Sample ports
Closed and capped
Leaks and contamination
Stop and reportAfter any service visit, walk the system with the drawing and confirm that every valve is back in its normal position before the system is released. A carbon bypass left open is one of the most dangerous errors in a water room.
Lesson · part 4
How a system is sized: a worked example
Figure 6. Sizing a system starts from peak demand. Cold feed water lowers reverse osmosis output, so capacity is checked at the lowest expected temperature.
Sizing is the designer’s job. A technician who understands it, though, can tell when the unit has outgrown its system. Here are the steps, with illustrative numbers only:
Figure 7. Sizing for the busiest, coldest hour. Four steps for sizing a water system for peak demand and cold feed water.
Figure 8 · Sizing in five steps
Count the usersMachines, reprocessing sinks, bicarbonate mixing, rinse and disinfection cycles.
Find peak demandThe moment the most water is drawn, usually at shift start.
Add a marginRoom for growth, and for a membrane that has aged.
Correct for cold waterCheck the output at the coldest feed temperature expected.
Check each stageCarbon contact time and softener capacity at that same flow.
Illustration. Twelve machines each drawing about 0.8 liters per minute while running gives about 10 liters per minute. Add 4 liters per minute for reprocessing and mixing: 14 liters per minute at peak. With a 20 percent margin the system should deliver about 17 liters per minute, at the coldest feed water of the year. Your own figures come from the machine manuals and the designer.
Two consequences follow. First, adding stations, a reprocessing machine, or hemodiafiltration raises peak demand. More flow through the same carbon bed means less contact time, so the carbon tanks can fall below their contact time even while the reverse osmosis unit keeps up. Second, low water pressure alarms at shift start are often a sizing signal, not a fault.
Lesson · part 5
Validation: proving the system before patients rely on it
A new or substantially changed system is not used on patients until documented test results show that it produces water within limits. This is validation. The medical director approves it.1
Figure 9 · What validation usually includes
Installation checkThe system matches the drawing; materials and connections are correct.
Operational checkFlows, pressures, alarms, and automatic valves work as designed.
Chemical analysisProduct water meets the chemical limits.
MicrobiologyCultures and endotoxin within limits, typically repeated over several weeks.
Disinfection proofDisinfectant reaches every point and rinses out completely.
RecordsResults, dates, and signatures filed in the system file.
The same thinking applies on a smaller scale after any major change: a new membrane, new carbon, pipe work, or a change of source. Module 11 covers what to retest after each kind of change.
On the floor
Real situations: problems and solutions
These are fictional but typical. For each one, cover the answer, decide what you would do, then compare. Where a step depends on local rules, your unit’s procedure and your supervisor’s direction come first.
Four new stations
What you see
At the Monday staff meeting, management announces four new dialysis stations, opening next month. Nothing in the water room is to be changed.
What is likely going on
Peak demand has risen by a third. The reverse osmosis unit may keep up, but water now passes through the carbon faster, and so spends less time in contact with it.
What to do
Ask for the carbon contact time and the softener capacity to be recalculated at the new peak flow. Report the result to the medical director before the stations open.
Why it matters
A system can quietly outgrow its design. The first sign may be chlorine breakthrough months later, with patients already connected.
A valve nobody can name
What you see
During your morning round you find an unlabeled valve on a side branch near the softener. The other technicians and the charge nurse do not know what it does.
What is likely going on
It may be an old bypass or a drain. In the wrong position it could let untreated water past a stage.
What to do
Do not operate it. Trace the pipe in both directions, mark it on the drawing, tag it, and ask the supplier to confirm its purpose in writing.
Why it matters
Valves that no one can name are how bypasses get left open.
The drawing does not match
What you see
The system drawing taped beside the door shows one carbon tank. Two are installed.
What is likely going on
The system was modified, and the drawing was never updated.
What to do
Mark up the drawing by hand, with the date and your name, and ask for a corrected version.
Why it matters
In an emergency, people follow the drawing. A wrong drawing sends them the wrong way at the worst moment.
Tanker water during a supply cut
What you see
On a Thursday the city supply fails, and by 10:00 management has arranged a tanker delivery to refill the feed tank.
What is likely going on
The tanker may have carried other loads, and its water may have very different chlorine, hardness, and particle levels from the city supply.
What to do
Treat it as a new source. Test it before use as your plan states, watch the filters and chlorine closely, and tell the nurse that the source has changed.
Why it matters
Emergency water is where contamination events begin.
Field notes
Know which water source you are on today, and who will tell you when it changes.
Tag every valve with a number that matches the drawing.
Keep the bypass valves on the carbon and the reverse osmosis unit closed and tagged during treatment.
Keep the feed water report from the design stage. It is your reference for every later comparison.
Case review
Back to the case: A new well replaces the city supply
What the deposits and the softener tell you. The source has changed, and the new water is very different. Reddish deposits point to iron in the well water. A softener that is used up twice as fast means the water is much harder than before.
Is zero feed chlorine good news? No. It means there is no disinfectant holding back bacterial growth in the pretreatment, and it confirms that the water is no longer coming from the city. Report all three findings to the charge nurse and the medical director the day you put them together.
What should have happened first. A change of source should have been preceded by a feed water analysis of the well; a review of whether the softener, filters, and membrane can cope; a decision about iron removal and microbial control; and re-validation with chemical and microbiological tests. Until that is done, the medical director decides whether treatment continues on this water. That decision is not the technician’s, and it is not the building owner’s.
Skills lab · with your preceptor
Skills checklist: Reading the system drawing and the feed water report
Materials: the system drawing, valve tags, the most recent feed water analysis, and the design-stage analysis. Your preceptor rates each step as satisfactory, needs practice, or not observed. Steps marked Critical must all be satisfactory before sign-off. This checklist supports supervised learning; your unit’s own procedure and competency form are the authority. A printable version of every checklist is on the trainer page.
CriticalNames the unit’s water source or sources and how the unit is told of a change.
Traces the drawing from feed to drain and matches each numbered valve to its tag.
CriticalStates the normal position of every bypass valve and shows how each is locked or tagged.
Reads five lines of the feed water report and says which component each affects.
Compares the current report with the design-stage report and points out any change.
Explains what would raise the unit’s peak demand.
CriticalStates who approves use of the system after a major change.
Placement activity. With your preceptor, update or create the valve list for your system: number, location, purpose, normal position.
Self-assessment
Check your understanding
Each visit draws 5 questions at random from this module’s 8-question bank. Choose the single best answer for each, then select Check answers; an explanation appears under the best answer. Select New set of questions for a different mix. A good target is 4 of 5 on two different sets. Nothing you select is sent anywhere; scoring happens in your browser.