The Preventive Maintenance Program

The inventory, the maintenance calendar, a visit step by step, safety notices and software, and spare parts.

PublishedNailathalaGipatikPepalwal: ReferencesMga SanggunianMga TinubdanReng Reperensya: 2 Audience: Biomedical equipment technicians working in or for hemodialysis centers · chief technicians, head nurses, and medical directors Read timeOras ng pagbasaOras sa pagbasaOras ning pamamasa:
A technician marking a wall planner of machine maintenance visits.
Renal Care Academy›Hemodialysis Center Biomedical Technician›Module 8 of 12 Study series for dialysis biomedical technicians
🛠️

Study series for dialysis biomedical technicians

This module is study material for biomedical technicians in dialysis. It explains how machines work and why maintenance steps exist; it is not a service manual. Repairs, calibrations, and safety tests are done only by people trained and authorized for that machine model, using the manufacturer’s service manual, approved parts, and calibrated test equipment. Every case is fictional.

After this module you should be able to

Pre-testBefore you read, answer the 5 self-assessment questions and note your score. After the module, select New set of questions and compare. The difference is what you learned; the questions you still miss are what to reread.

The big picture, in plain words

In plain wordsA jeepney operator with a fleet of ten does not wait for a vehicle to break down on EDSA. He keeps a list of every unit, knows when each one is due for its oil change and brake check, and sends them to the shop one or two at a time so the routes stay covered. Preventive maintenance on dialysis machines works the same way. You know every machine you are responsible for, visit each one on a schedule set by its maker, replace the parts that wear, and test what matters, whether or not anyone has complained.

The picture has a limit. A jeepney that breaks down costs a day’s fares. A machine that fails during treatment affects a patient whose blood is outside the body. And many machine faults give no warning a driver would hear or feel. Preventive maintenance is the least dramatic part of the job and the part that prevents the most harm. A center that does it well has few emergencies.

Figure 1 · Key terms for this module

InventoryThe list of every piece of equipment, with its identity and status.
Asset numberThe center’s own number for each item.
Maintenance intervalHow often a visit is due, by months or operating hours.
Maintenance kitThe set of wearing parts replaced at a visit.
Safety noticeA manufacturer’s formal warning requiring action.
OverduePast the due date. A reportable status.

Case: Inspection month

It is a Monday morning in early August. You have just joined a center that has fourteen machines on a six-month maintenance interval. Going through the files, you find that nothing has been done since the last licensing inspection, eleven months ago. The next inspection is in three weeks.

At the morning huddle, the chief technician, Mr. Rodel Mendoza, 51, proposes doing all fourteen machines in the two weeks before the inspector arrives. The unit will keep running its usual three shifts. The head nurse, Ms. Carmela Aquino, asks how many machines will be out at once.

Before reading on, decide:

Keep your answers in mind. The lesson gives you what you need, and the case review near the end shows one sound response.

Building a maintenance program

The World Health Organization describes a maintenance program as three linked parts: an inventory of every device, a schedule of inspection and preventive maintenance, and a system for corrective maintenance, all supported by records.1 The inventory tells you what you are responsible for, the schedule tells you when each item is due, and the records tie them together. For a dialysis machine, the content of each visit comes from the manufacturer: which parts are replaced at which interval, which checks are done, and which tests follow.

Six steps from the service manual to a maintenance calendar.
Figure 2. From manual to calendar. Six steps from the service manual to a maintenance calendar.
Year grid showing staggered maintenance visits for twelve machines.
Figure 3. A staggered year. Year grid showing staggered maintenance visits for twelve machines.
Typical contents of a preventive maintenance kit.
Figure 4. What is in a maintenance kit. Typical contents of a preventive maintenance kit.

Figure 5 · From manual to calendar

  1. List every machineModel, serial number, location, and assignment.
  2. Read the scheduleIntervals by months or operating hours, whichever comes first.
  3. Spread the workStagger visits so that only a few machines are out at a time.
  4. Stock the kitsOrder maintenance kits and common spares ahead.
  5. Do and recordComplete each visit by the checklist.
  6. ReviewTrack what is overdue, and why.

Do the arithmetic. A center with twelve machines on a six-month interval has twenty-four visits a year, about one every two weeks. Planned that way, maintenance never competes with a full treatment schedule. Left until inspection month, it competes with every shift.

RememberAn overdue preventive maintenance visit is a reportable risk, not an administrative detail. When one is overdue, tell the chief technician and the charge nurse, and record the reason.

The equipment inventory

You cannot maintain what you have not listed. A machine missing from the list has no due date, so no visit is ever scheduled for it, and nobody notices until something fails. The inventory is the foundation of the program and one of the first things an inspector asks for.1,2 Each field in it has a job.

FieldWhy it is there
Asset number, model, serial numberUnique identity
Location and station; hepatitis isolation assignmentWhere it is now, and where it must stay
Date installed; acceptance test referenceThe start of its history
Software versionProcedures and notices depend on it
Configured concentrate system and tubing setMust match the unit’s supplies
Maintenance interval; last visit; next dueDrives the calendar
Operating hours at last visitFor hour-based intervals
Electrical safety test: last and next dueA separate schedule in many centers
Status: in service, out of service, on loan, retiredSo that nobody uses the wrong machine

The list covers more than dialysis machines. Include reverse osmosis units and water system components if they fall to you, reprocessing machines, the defibrillator, patient scales, blood pressure monitors, infusion pumps, and the test instruments themselves. Scales and blood pressure monitors look like simple equipment, but they drive clinical decisions: the weight decides how much fluid is removed, and the monitor catches low blood pressure. A scale reading two kilograms wrong is a treatment error.

A preventive maintenance visit, step by step

A visit follows a fixed order for a reason. You decontaminate before you open anything, so you are not working in used dialysate. You record before you replace, so the history shows how the machine was performing. You test last, so the tests cover everything you touched.

Figure 6 · The order of a visit

  1. PrepareConfirm the machine is free. Check the kit, manual revision, safety notices, and test instruments.
  2. ReceiveTag out. Ask operators about any problems. Read the alarm history if the machine keeps one.
  3. DecontaminateDisinfection program and external wipe.
  4. InspectCabinet, hoses, connectors, cord, casters; look for leaks, scale, corrosion.
  5. ReplaceWearing parts from the kit, by the manual.
  6. Verify and calibrateTemperature, conductivity, pressures, flows, ultrafiltration.
  7. Test protectionEach protective system.
  8. Electrical safetyIf due, or if the work affected it.
  9. FinishDisinfect, residual test, record, release to the charge nurse.
Often skippedWhy it matters
Asking the operators firstThey know the intermittent problems that you will not see on the bench
Recording as-found values before replacing or adjusting anythingIt shows how the machine was performing for patients
Checking the batteryIt is needed only on the day the power fails, and it must work then
Inlet and drain hosesOld hoses harbor biofilm, and they split
Casters and brakesA machine that rolls can pull on the patient’s lines
Updating the inventoryThe next due date is calculated from it

Safety notices, recalls, and software updates

A manufacturer keeps learning about its machines after they are sold, from the reports of the centers that use them. When it finds a problem, such as a part that fails early, a software error, or a procedure that needs to change, it issues a notice. A notice may ask for an inspection, a part change, or an update by a certain date. It protects your patients only if it reaches you and you act on it.

Figure 7 · Handling a safety notice

  1. ReceiveMake sure notices reach the technician, not only the purchasing office.
  2. IdentifyWhich of your machines are affected, by model, serial range, and software version.
  3. ActCarry out the action by the stated date.
  4. RecordPer machine: notice reference, date done, by whom.
  5. InformThe chief technician, charge nurse, and medical director, especially if use must change meanwhile.
  6. CloseReturn any acknowledgment the manufacturer requires.

Software updates change how a machine behaves, sometimes in ways no one sees until an alarm or a screen looks different. Install only versions supplied by the manufacturer for that model. Record the old and new versions, repeat the tests that the update instructions call for, and tell operators about any change they will see on the screen. Keep all machines of one model on the same version where you can. A nurse who moves between two machines of the same model expects them to behave alike; mixed versions confuse operators and technicians.

Spare parts and downtime

Keep on siteReason
Maintenance kits for visits due in the next quarterSo that no visit is late for lack of parts
Fuses of every specified typeThey are cheap, and the wrong one is dangerous
Common seals, O-rings, and dialyzer connector sealsSmall leaks are frequent
Transducer protectors and internal filtersThey are replaced after contamination
Inlet and drain hosesThey are replaced on schedule
A few high-failure parts, chosen from your own repair historyThey shorten downtime
Residual test strips and approved disinfectantsWithout them, no machine can be released

Buy parts from the manufacturer or its authorized distributor, store them as the label says, and use the oldest first. Then track downtime. For each fault, count the days from tagging out to release, and write down the reason for any wait. The reasons tell you where the program is weak. If most downtime is spent waiting for parts, the stock list needs changing. If it is spent waiting for a technician, the staffing or training does.

Illustrative quality dashboard with metric tiles and small trend lines.
Figure 8. A few indicators, such as visits done on time and days out of service, show whether the program is keeping up.

Real situations: problems and solutions

These are fictional but typical. For each one, cover the answer, decide what you would do, then compare. Where a step depends on local rules, your unit’s procedure and your supervisor’s direction come first.

Maintenance due, no kit

What you see
On the first of the month, a machine reaches its maintenance interval. The maintenance kit is still at the supplier’s warehouse.
What is likely going on
The wearing parts are now past their planned life.
What to do
Report the overdue status in writing. Do the inspection and the tests that need no parts, and schedule the full visit for when the kit arrives.
Why it matters
Hidden overdue maintenance is a risk that nobody chose. Once it is reported, it becomes a managed decision.

A service report with no numbers

What you see
An outside engineer finishes a visit and leaves a report that says only “preventive maintenance (PM) done, OK.”
What is likely going on
There is no evidence of what was checked or measured.
What to do
Ask for the completed checklist, with readings, before you accept the machine back.
Why it matters
The center, not the contractor, answers to the inspector and to the patient.

The machine nobody listed

What you see
During a Saturday audit you find a dialysis machine in the isolation room that does not appear in the inventory.
What is likely going on
It has no maintenance history, no scheduled visits, and no electrical safety record.
What to do
Add it to the inventory, tell the chief technician, and treat it as overdue. It needs a full visit and a safety test before further use, as the medical director directs.
Why it matters
Equipment outside the inventory is equipment outside the program.
Field notes
  • Spread maintenance through the year so it never competes with a full schedule.
  • Put the calibration due date on every test instrument.
  • Always record the as-found value before the as-left value.
  • Review the list of overdue items each month with the chief technician.

Back to the case: Inspection month

How many visits were due, and the status of every machine. About twenty-six. Fourteen machines on a six-month interval need about twenty-six visits in eleven months. None were done, so every machine is overdue, some by five months. That is a reportable status, not a paperwork gap.

The risks of fourteen visits in two weeks. Rushed work, skipped tests, several machines out at once with shifts cancelled, and no kits or calibrated instruments ready. Ms. Aquino’s question is the right one. The plan also produces records that all carry the same fortnight’s dates, which tells an inspector exactly what happened.

What to report now, and the plan from now on. The honest course is to report the overdue status to the medical director now. Prioritize machines by time since the last visit and by any reported problems, do as many properly as can be done without compromising treatment, and record truthfully. From now on, keep a calendar with two or three visits a month, order kits a quarter ahead, review an overdue list monthly, and put maintenance on the agenda of the quality meeting.

Skills checklist: Building a maintenance calendar and running a visit

Materials: the equipment inventory, service manuals, a year planner, one maintenance kit, and a blank visit checklist. Your preceptor rates each step as satisfactory, needs practice, or not observed. Steps marked Critical must all be satisfactory before sign-off. This checklist supports supervised learning; your unit’s own procedure and competency form are the authority. A printable version of every checklist is on the trainer page.

Placement activity. Bring your center’s inventory up to date for five machines, including software version and concentrate configuration.

Check your understanding

Each visit draws 5 questions at random from this module’s 8-question bank. Choose the single best answer for each, then select Check answers; an explanation appears under the best answer. Select New set of questions for a different mix. A good target is 4 of 5 on two different sets. Nothing you select is sent anywhere; scoring happens in your browser.

Question 1 of 8What is preventive maintenance?
Question 2 of 8A center has ten machines with a six-month maintenance interval. About how many visits are needed per year?
Question 3 of 8A center has fourteen machines on a six-month interval. How many visits are due each year?
Question 4 of 8Why should patient scales be in the equipment inventory?
Question 5 of 8What is the first step when a manufacturer’s safety notice arrives?
Question 6 of 8Before starting a maintenance visit, whom should you ask about the machine?
Question 7 of 8Most of your downtime is machines waiting for parts. What should change?
Question 8 of 8After a software update, what must be recorded?

Read next on this site

Glossary & abbreviationsTalahulugan at mga daglatTalaan sa mga pulong ug daglatTalatinigan ampo reng daglat terms used on this page

Abbreviations

PM
Preventive maintenance — Scheduled service done before something breaks.

Terms in plain words

Recall
A manufacturer’s instruction to return, replace, or correct a product.
Operating hours counter
The machine’s record of how long it has run.
Authorized distributor
A supplier approved by the manufacturer to sell its parts.
ReferencesMga SanggunianMga TinubdanReng Reperensya 2 sources
  1. World Health Organization (WHO). (2011). Medical equipment maintenance programme overview (WHO Medical Device Technical Series). https://www.who.int/publications/i/item/9789241501538
  2. Department of Health (DOH). (2012). Administrative Order No. 2012-0001: New rules and regulations governing the licensure and regulation of dialysis facilities in the Philippines. https://hfsrb.doh.gov.ph/wp-content/uploads/2021/05/AO-2012-0001.pdf
Dr. William Gregory M. Rivero, MD

William Gregory Rivero, MD, FPCP, DPSN

Internal Medicine · Nephrology · Nutrition · Philippines · PRC 0105184

Educational study material for biomedical technicians. Does not replace the manufacturer’s service manual and training, approved facility procedures, applicable electrical and medical device regulations, or supervised practice.

QR code — scan to save Dr. Rivero's contact info

Scan and save