- Plan one role at a time (for example nephrologists, dialysis nurses, or dietitians). Hours from one profession are never counted as capacity for another.
- List each activity with its annual volume and the mean total minutes per activity, including preparation, documentation, coordination, and routine review. Add fixed-hour rows for minimum coverage, travel, handover, supervision, or reserve that activity minutes do not already include. Rows must not overlap.
- Enter filled paid full-time equivalents (FTE), paid hours per week, working weeks after leave and holidays, and the share of those hours available for the modeled work. Vacant funded posts are not supply. Count teaching and administration either as demand rows or by lowering the available share, never both.
- Press Calculate. Save the result as a baseline, change one assumption, and calculate again to compare scenarios.
All computation runs in your browser; nothing is stored or transmitted.
When to Use
Use this planner when a service director needs to know which role and which activities require more funded time. It converts a bottom-up workload inventory into hours, then into FTE, so the conversation moves from “we are busy” to “nephrology needs about 240 more available hours a year, mostly for clinic follow-up.”
There are no published universal workload coefficients for kidney care, so every minute value here should come from your own time study, rota, or work sample. The 2023 International Society of Nephrology Global Kidney Health Atlas (ISN-GKHA) shows how much staffing differs between countries, and the American Society of Pediatric Nephrology recommends counting nonbillable as well as billable clinical work; both are reasons to measure locally rather than borrow another system’s ratios.
Annual hours are not shift coverage
A role can have enough hours across the year and still be uncovered at 7 a.m. on a Monday. Check minimum simultaneous coverage with the Dialysis Shift Coverage Planner or your roster.
Pearls & Pitfalls
Headcount is not capacity
Ten names on a register can deliver less than six focused FTE if most of their week goes to other sites, administration, or travel. The available share (A) is where that reality enters the arithmetic, so write down what it excludes.
Measure the invisible work
Inbox messages, results review, family calls, care coordination, and supervision are real demand. If they are not in the activity minutes, add them as rows; otherwise the planner will understate the gap in exactly the work that drives burnout.
Do not convert hours into a safe panel size
Team roles, case mix, and concurrency mean total hours cannot be turned into a “safe” number of patients per clinician. This tool estimates funded time, nothing more.
Kidney Care Capacity & FTE Gap Planner
Annual demand hours D = Σ(volume × minutes ÷ 60) + fixed hours. Available hours per FTE H = paid hours/week × working weeks × available share. Capacity S = filled FTE × H (+ locum hours). Additional FTE = max(0, D − S) ÷ H.
What This Does Not Estimate
This planner does not estimate mortality, burnout, quality of care, patient safety, or legal or accreditation compliance, and it does not say whether a fraction of an FTE can actually be recruited. A result of 0.17 additional FTE means the modeled hours exceed capacity by that amount; it does not mean a part-time hire is available or that minimum coverage is met. Missing policy data means “not assessed,” never “compliant.”
Next steps: compare the minutes with a representative time study, rota, and payroll definitions; test minimum coverage separately; and repeat the calculation for every role the change touches, so a gap is not quietly shifted to another team.
Formula & Methods
H = W × Y × A
S = P × H + locum hours
Workload FTE requirement = D ÷ H
Signed hour gap = D − S; shortfall = max(0, D − S)
Additional paid FTE = shortfall ÷ H
Utilization = D ÷ S × 100% (only when S > 0)
Validation rules: W > 0; 0 < Y ≤ 52.18; 0 ≤ A ≤ 100%. When A = 0 the planner shows hours only and suppresses the FTE conversion. With no available capacity, utilization is reported as undefined. Blank fields are errors, never zeros. Full precision is kept; FTE values are displayed to two decimals and whole people are rounded up explicitly.
Illustrative example (hypothetical): 5,000 activities × 30 minutes = 2,500 h, plus 500 fixed h, gives D = 3,000 h. W = 40, Y = 46, A = 75% gives H = 1,380 h per FTE. P = 2 gives S = 2,760 h. Shortfall = 240 h; additional FTE = 0.17; requirement = 2.17 FTE. These numbers are reproduced by the site’s automated tests.
Evidence
The 2023 ISN-GKHA survey of 167 countries reported a median of 11.75 nephrologists per million population (interquartile range 1.78–24.76), with medians of 3.18 per million in Oceania and South East Asia and 1.12 in Africa; most countries also reported shortages of dialysis nurses and vascular access coordinators (Okpechi et al., 2024). These are country-reported descriptive figures, not staffing standards. A United States projection model estimates nephrologist supply at 92.5% of demand in 2025, falling to 78.5% by 2037 (Silvestre et al., 2026), which motivates planning but cannot calibrate a local model elsewhere. The American Society of Pediatric Nephrology consensus recommends accounting for billable and nonbillable clinical effort (Soranno et al., 2024).
The evidence motivates the tool; it does not validate the formula. Validation status: operational arithmetic reviewed, real-world usefulness not yet evaluated.
