After this module you should be able to
- Explain why disasters endanger dialysis patients more than most people.
- Map the unit’s dependencies and the backup for each.
- Secure transfer agreements and patient contact plans before the season starts.
- Reopen only through a restart gate.
The big picture, in plain words
The picture has a limit. A storm warning gives days of notice. Patients still cannot dialyze in advance for a week. What preparation can do is move sessions earlier before landfall, keep the unit running or a partner unit ready, and know where every patient is.
Figure 1 · Key terms for this module
Your work is to fund and test the plan before the season, and to reopen only when it is safe.
Case: Signal number 3
On a Sunday evening, PAGASA raises Tropical Cyclone Wind Signal No. 3 over the province around a unit in Legazpi, Albay, with landfall expected on Monday afternoon. Forty-two patients are scheduled for Monday and Tuesday. The unit’s generator was last tested in March, and the patient contact list was last updated in June.
Before reading on, decide:
- What can be done before landfall?
- What does the unit need to stay open, and what if it cannot?
- When will it reopen?
Keep your answers in mind. The lesson gives you what you need, and the case review near the end shows one sound response.
Why disasters endanger dialysis patients
After Hurricane Sandy in 2012, United States dialysis patients in the affected areas had more emergency visits and hospital admissions in the following weeks than in comparable periods.1 Patients who dialyzed early, before the storm, were less likely to need emergency care and hospitalization afterward.2 Both studies were observational, but they point to the same practical rule: move sessions earlier before the storm. Asia-Pacific nephrologists have described the same problems after earthquakes, floods, and typhoons in our region.3
Philippine law requires disaster risk reduction and management (DRRM) planning, and local plans assume that facilities know their own vulnerabilities.4
The dependency map

List what a session needs and the backup for each: power (generator with fuel for a stated number of days, tested under load), water (supply plan and storage), staff (a call tree and, if needed, a place to stay), supplies (extra stock before the season), patients (current contact list and transport), and records (the paper kit from Module 20). Assign an owner to each line and test it before the season.
Transfers and the patient list
Sign transfer agreements with at least one partner unit outside your likely flood or storm zone, with contacts and the paperwork each patient needs: prescription, serology, and access. Keep each patient’s emergency information current and give patients an emergency card and a three-day emergency diet plan prepared by the dietitian and clinicians. During and after a storm, account for every patient by name.
Use the continuity planner to estimate how many sessions you can deliver at reduced capacity and how many must move.
Reopen through a gate

Reopening after a disaster follows the same logic as opening day. The building is safe, power is stable, the water is tested and released by the technical lead, the machines are checked, and enough staff are present. Until then, keep transfers going. When the unit reopens, the attending nephrologists triage patients by clinical urgency, assessing potassium, fluid, breathing, and symptoms, rather than following a simple order of missed sessions.
Back to the case: Signal number 3
Before landfall. Ask the nephrologists to move Monday and Tuesday sessions earlier, to Sunday night and Monday morning where possible. Test the generator now, top up fuel, update contacts, and confirm the partner unit.
To stay open. Power, water, staff, and supplies. If any fails, transfer patients by name.
Reopening. When the restart gate passes, not before; the order of patients set by physician-led triage of clinical urgency.
Skills checklist: Continuity dependency map, transfer record, and restart gate
Build a dependency map, a transfer agreement checklist, and a restart gate for your unit. Your preceptor rates each step as satisfactory, needs practice, or not observed. Steps marked Critical must all be satisfactory before sign-off. This checklist supports supervised learning; your unit’s own procedure and competency form are the authority. A printable version of every checklist is on the trainer page.
- Explains why disasters endanger dialysis patients, with the observational evidence.
- Maps every dependency with a tested backup and an owner.
- Keeps current patient contacts and emergency cards.
- Holds signed transfer agreements outside the likely hazard zone.
- CriticalReopens only after water is released by the technical lead and machines are checked.
- CriticalAccounts for every patient by name during and after a disaster.
Check your understanding
Each visit draws 5 questions at random from this module’s 6-question bank. Choose the single best answer for each, then select Check answers; an explanation appears under the best answer. Select New set of questions for a different mix. A good target is 4 of 5 on two different sets. Nothing you select is sent anywhere; scoring happens in your browser.
Read next on this site
- Typhoon and Disaster Preparedness in DialysisTyphoon preparedness for dialysis patients.