Administrative Staff · Module 21 of 24

Disasters, Emergency Coverage, and Continuity

Why disasters kill dialysis patients, the dependency map, transfer agreements, and the restart gate.

PublishedNailathalaGipatikPepalwal: ReferencesMga SanggunianMga TinubdanReng Reperensya: 4 Audience: Owners and prospective owners of hemodialysis units · investors, trustees, and board members · authorized governing representatives of single-site and multi-site services Read timeOras ng pagbasaOras sa pagbasaOras ning pamamasa:
A dialysis clinic on a flooded street after a typhoon, a small rescue boat bringing patients to a raised entrance while a generator runs.
Renal Care Academy›Dialysis Unit Owner›Module 21 of 24 Course for the people who own and govern hemodialysis services
🏛️

Course for the people who own and govern hemodialysis services

This module is study material for owners and governing boards of adult maintenance hemodialysis services. The owner supplies authority, resources, and assurance; clinical decisions belong to the attending nephrologist and the clinical head, nursing assignments to the nursing lead, and technical release to the designated technician. Regulations and payer rules change: confirm each one against the current issuance. Every case, person, and peso figure is fictional.

After this module you should be able to

Pre-testBefore you read, answer the 5 self-assessment questions and note your score. After the module, select New set of questions and compare. The difference is what you learned; the questions you still miss are what to reread.

The big picture, in plain words

In plain wordsFor most people a typhoon is three bad days. For a dialysis patient it can be a missed session on Monday, another on Wednesday, and a dangerous potassium level by Thursday. The storm does not have to touch the patient to harm them; it only has to close the unit.

The picture has a limit. A storm warning gives days of notice. Patients still cannot dialyze in advance for a week. What preparation can do is move sessions earlier before landfall, keep the unit running or a partner unit ready, and know where every patient is.

Figure 1 · Key terms for this module

Continuity planThe unit’s plan to keep treating patients, or to move them safely, during a disruption.
Dependency mapA picture of what the unit needs to operate and the backup for each.
Transfer agreementA written arrangement with a partner unit to accept patients.
Restart gateThe checks that must pass before reopening after a disaster.

Your work is to fund and test the plan before the season, and to reopen only when it is safe.

Case: Signal number 3

On a Sunday evening, PAGASA raises Tropical Cyclone Wind Signal No. 3 over the province around a unit in Legazpi, Albay, with landfall expected on Monday afternoon. Forty-two patients are scheduled for Monday and Tuesday. The unit’s generator was last tested in March, and the patient contact list was last updated in June.

Before reading on, decide:

Keep your answers in mind. The lesson gives you what you need, and the case review near the end shows one sound response.

Why disasters endanger dialysis patients

After Hurricane Sandy in 2012, United States dialysis patients in the affected areas had more emergency visits and hospital admissions in the following weeks than in comparable periods.1 Patients who dialyzed early, before the storm, were less likely to need emergency care and hospitalization afterward.2 Both studies were observational, but they point to the same practical rule: move sessions earlier before the storm. Asia-Pacific nephrologists have described the same problems after earthquakes, floods, and typhoons in our region.3

Philippine law requires disaster risk reduction and management (DRRM) planning, and local plans assume that facilities know their own vulnerabilities.4

RememberDialyze early before landfall, then know where every patient is.

The dependency map

Typhoon continuity: what must keep running
Figure 2. Typhoon continuity: what must keep running. Shows the dependencies a dialysis session needs during a disaster and the backup for each.

List what a session needs and the backup for each: power (generator with fuel for a stated number of days, tested under load), water (supply plan and storage), staff (a call tree and, if needed, a place to stay), supplies (extra stock before the season), patients (current contact list and transport), and records (the paper kit from Module 20). Assign an owner to each line and test it before the season.

RememberEvery dependency has a backup and a person who has tested it.

Transfers and the patient list

Sign transfer agreements with at least one partner unit outside your likely flood or storm zone, with contacts and the paperwork each patient needs: prescription, serology, and access. Keep each patient’s emergency information current and give patients an emergency card and a three-day emergency diet plan prepared by the dietitian and clinicians. During and after a storm, account for every patient by name.

Use the continuity planner to estimate how many sessions you can deliver at reduced capacity and how many must move.

RememberBefore the season: current contacts, signed partners, and a card in every patient’s hand.

Reopen through a gate

Before reopening after a disaster
Figure 3. Before reopening after a disaster. Prevents an unsafe restart: the same release logic as opening day.

Reopening after a disaster follows the same logic as opening day. The building is safe, power is stable, the water is tested and released by the technical lead, the machines are checked, and enough staff are present. Until then, keep transfers going. When the unit reopens, the attending nephrologists triage patients by clinical urgency, assessing potassium, fluid, breathing, and symptoms, rather than following a simple order of missed sessions.

Stop and reportDo not reopen on untested water or unchecked machines, however long the patients have waited.
RememberReopen through the gate, not around it.

Back to the case: Signal number 3

Before landfall. Ask the nephrologists to move Monday and Tuesday sessions earlier, to Sunday night and Monday morning where possible. Test the generator now, top up fuel, update contacts, and confirm the partner unit.

To stay open. Power, water, staff, and supplies. If any fails, transfer patients by name.

Reopening. When the restart gate passes, not before; the order of patients set by physician-led triage of clinical urgency.

Skills checklist: Continuity dependency map, transfer record, and restart gate

Build a dependency map, a transfer agreement checklist, and a restart gate for your unit. Your preceptor rates each step as satisfactory, needs practice, or not observed. Steps marked Critical must all be satisfactory before sign-off. This checklist supports supervised learning; your unit’s own procedure and competency form are the authority. A printable version of every checklist is on the trainer page.

Placement activity. Call five patients from the contact list and check that the numbers still work.

Check your understanding

Each visit draws 5 questions at random from this module’s 6-question bank. Choose the single best answer for each, then select Check answers; an explanation appears under the best answer. Select New set of questions for a different mix. A good target is 4 of 5 on two different sets. Nothing you select is sent anywhere; scoring happens in your browser.

Question 1 of 6What did Lurie and colleagues find about dialysis before Hurricane Sandy?
Question 2 of 6Which is a dependency that needs a tested backup?
Question 3 of 6Where should a partner unit for transfers ideally be?
Question 4 of 6After a typhoon, when can the unit reopen?
Question 5 of 6Who decides the order in which patients are dialyzed after reopening?
Question 6 of 6When should the generator be tested?

Read next on this site

Glossary & abbreviationsTalahulugan at mga daglatTalaan sa mga pulong ug daglatTalatinigan ampo reng daglat terms used on this page

Abbreviations

DRRM
Disaster risk reduction and management.

Terms in plain words

PAGASA
The Philippine Atmospheric, Geophysical and Astronomical Services Administration, which issues storm warnings.
ReferencesMga SanggunianMga TinubdanReng Reperensya 4 sources
  1. Kelman, J., Finne, K., Bogdanov, A., Worrall, C., Margolis, G., Rising, K., MaCurdy, T. E., & Lurie, N. (2015). Dialysis care and death following Hurricane Sandy. American Journal of Kidney Diseases, 65(1), 109–115. https://doi.org/10.1053/j.ajkd.2014.07.005
  2. Lurie, N., Finne, K., Worrall, C., Jauregui, M., Thaweethai, T., Margolis, G., & Kelman, J. (2015). Early dialysis and adverse outcomes after Hurricane Sandy. American Journal of Kidney Diseases, 66(3), 507–512. https://doi.org/10.1053/j.ajkd.2015.04.050
  3. Gray, N. A., Wolley, M., Liew, A., & Nakayama, M. (2015). Natural disasters and dialysis care in the Asia-Pacific. Nephrology, 20(12), 873–880. https://doi.org/10.1111/nep.12522
  4. Republic Act No. 10121: Philippine Disaster Risk Reduction and Management Act of 2010. (2010). Congress of the Philippines.
Dr. William Gregory M. Rivero, MD

William Gregory Rivero, MD, FPCP, DPSN

Internal Medicine · Nephrology · Nutrition · Philippines · PRC 0105184

Educational material for owners and governing boards. Academy learning completion record. This does not confer a DOH license, PhilHealth accreditation, PSN attestation, professional eligibility, CPD credit or authority to undertake clinical or technical duties. It does not replace current regulations, your entity’s legal, tax, and labor advisers, or the clinicians and technicians who own clinical and technical decisions.

QR code — scan to save Dr. Rivero's contact info

Scan and save